Want to improve your material hauling process?
Try our online estimator to determine CAPEX and OPEX. *
Distance (Enter as km or mi) |
|
Your Calculation RESULTS
(results shown in US dollars)
Need a Rail-Veyor estimate for a specific project?
Fill out the form and we will get back to you in no time
*Assumptions (based on 20 year life):
- Energy cost................................. $0.07 Kwh
- Days per year............................... 350
- Hours per day............................... 24
- Rail-Veyor system........................ shuttle & loop
- Rail-Veyor car............................... 30 inch (762 mm) wide
- Max grade..................................... 20%
- Material density (hauled).............. 112 lbs/cu ft (1800 kg/m3)
- Power distribution system............ not included
- Engineering................................... included
- Dump loop and unloading equipment........included
- Loading system & equipment....... not included